BREEAM Sustainability champion
Contents |
[edit] Aim and benefits
The BREEAM Sustainability Champion also known as the BREEAM AP (Advisory Professional) helps to achieve project's BREEAM targets and maximise opportunities for project performance. Many clients appreciate the support of a proactive BREEAM AP to explain the BREEAM criteria and requirements to them and provide templates for their reports.
[edit] When to consider
The earlier in the design process the better - at Concept Design stage (RIBA stage 0-2)
[edit] Step-by-step guidance
[edit] RIBA stage 0-2
- Client to appoint BREEAM AP.
- BREEAM AP should attend a key design team meeting and/or preferably run a separate BREEAM workshop session to set BREEAM targets and identify potential opportunities and challenging credits. A proactive BREEAM AP would list those credits which require actions at early stages and liaise with relevant consultants in charge to ensure documents are created prior to RIBA stage 2 freeze.
- BREEAM assessor, if appointed at this time, or the BREEAM AP could run a BREEAM pre-assessment based on the design documents at RIBA stage 2. This is useful to check the project against BREEAM performance and individual credit performance. The pre-assessment report is also helpful for planning or funding applications.
[edit] RIBA stage 3-4
- BREEAM AP should attend the key design team meetings as a minimum to ensure BREEAM performance targets are not lost.
- BREEAM APs to record all their meeting minutes and correspondence with the project team to demonstrate progress against BREEAM targets.
[edit] RIBA stage 5-6
- If a different person provides BREEAM AP support to the contractors at construction stage, they should record and keep handover notes from the design stage BREEAM AP to include in the evidence documents.
- BREEAM AP to provide regular site attendance and project meetings to ensure construction and installations are in line with the targeted BREEAM standards.
- Site visit reports and project meeting minutes to be provided as evidence.
[edit] Questions to ask while seeking compliance
The main issues for this credit compliance is to have proper and clear meeting minutes and communication documents to demonstrate involvement of the BREEAM AP. So the question to be asked is; if a BREEAM AP is officially appointed and if all the AP correspondence are documented?
[edit] Tools and resources
- Sustainability champion - Top 10 easy wins issue
- http://www.breeam.com/BREEAMUK2014SchemeDocument/#04_management/man01.htm%3FTocPath%3D4.0%2520Management%7C_____1
- http://www.breeam.com/BREEAMUK2014SchemeDocument/#04_management/man03.htm%3FTocPath%3D4.0%2520Management%7C_____3
[edit] Tips and best practice
BREEAM AP role and BREEAM assessment can be taken by the same person but a letter must be provided to declare any conflict of interest.
[edit] Typical evidence
- Appointment documents.
- Meeting minutes.
- Trackers and reports to demonstrate progress against the target.
- Handover notes, if necessary.
[edit] Applicable schemes
The guidelines collated in this Issue Support document (ISD) aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- UK New Construction 2014.
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Azita Dezfouli 16:30, 10 Jan 2018 (BST)
See also: BREEAM Advisory Professional.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























